Skip to main content

Engineering Collection (page 2)

Background imageEngineering Collection: New Carlin How Railway Bridge is undergoing emergency engineering work due to subsidence

New Carlin How Railway Bridge is undergoing emergency engineering work due to subsidence, Redcar and Cleveland, Teesside, North East England, January 1974

Background imageEngineering Collection: Kirkby Manufacturing and Engineering Works, Kirkby, Wednesday 28th March 1979

Kirkby Manufacturing and Engineering Works, Kirkby, Wednesday 28th March 1979

Background imageEngineering Collection: Kirkby Manufacturing and Engineering workers cooperative, members leaving meeting

Kirkby Manufacturing and Engineering workers cooperative, members leaving meeting, Kirkby, Friday 10th February 1978

Background imageEngineering Collection: Gun barrels being greased before being attached to tanks under construction at the Royal

Gun barrels being greased before being attached to tanks under construction at the Royal Ordnance Factory, Llanishen. 17th April 1951

Background imageEngineering Collection: Tanks under construction at the Royal Ordnance Factory, Llanishen. 17th April 1951

Tanks under construction at the Royal Ordnance Factory, Llanishen. 17th April 1951

Background imageEngineering Collection: Gun barrels for tanks under construction at the Royal Ordnance Factory, Llanishen

Gun barrels for tanks under construction at the Royal Ordnance Factory, Llanishen, 17th April 1951

Background imageEngineering Collection: Quality control seen here being carried out on anvils manufactured at K & L Steel

Quality control seen here being carried out on anvils manufactured at K & L Steel Founders and Engineer Limited, Letchworth. Circa November 1949

Background imageEngineering Collection: Components for the construction of mobile cranes seen here being manufactured at

Components for the construction of mobile cranes seen here being manufactured at the Jones Crane factory in Letchworth. Circa November 1949

Background imageEngineering Collection: Shipbuilders at the King George V dry dock in Southampton replace one of the mighty

Shipbuilders at the King George V dry dock in Southampton replace one of the mighty propellors of the Cunard liner R.M.S. Queen Mary

Background imageEngineering Collection: Machinist at Newly Brothers Engineering works in Birmingham. 10th November 1949

Machinist at Newly Brothers Engineering works in Birmingham. 10th November 1949

Background imageEngineering Collection: Diesel engines being assembled at the Perkins factory in Peterborough. 10th November 1949

Diesel engines being assembled at the Perkins factory in Peterborough. 10th November 1949

Background imageEngineering Collection: Home Office steel A. R. P. Shelters tested at Shotton. Scenes in the works of Messrs. J

Home Office steel A. R. P. Shelters tested at Shotton. Scenes in the works of Messrs. J
Home Office steel A.R.P. Shelters tested at Shotton. Scenes in the works of Messrs. J. Summers and Sons, Ltd. where thousands of the shelters are being made

Background imageEngineering Collection: Pictured, apprentices of Driver Southall Ltd, who found an answer to label snags

Pictured, apprentices of Driver Southall Ltd, who found an answer to label snags. 4th September 1972

Background imageEngineering Collection: The Martinsyde Raymor biplane being assembled at the airfield at Quidi Vidi Lake in St

The Martinsyde Raymor biplane being assembled at the airfield at Quidi Vidi Lake in St. John s, Newfoundland, prior to the attempt by Frederick Raynham (pilot) and C.W.F

Background imageEngineering Collection: The huge floating dock built at Wallsend passes down the River Tyne on its long journey

The huge floating dock built at Wallsend passes down the River Tyne on its long journey to Singapore. 21st June 1928

Background imageEngineering Collection: Mr. Kenneth Anderson (consulting engineer) looking at a model of the new Runcorn-Widnes

Mr. Kenneth Anderson (consulting engineer) looking at a model of the new Runcorn-Widnes road bridge with Mr Watkinson. 8th October 1958

Background imageEngineering Collection: Mr M. F Howarth (Widnes Town Clerk), Alderman J. T Clayton

Mr M. F Howarth (Widnes Town Clerk), Alderman J. T Clayton
Mr M.F Howarth (Widnes Town Clerk), Alderman J.T Clayton (chairman of the the Joint Committee), Councillor D. McCulloch and Mr

Background imageEngineering Collection: Aeronautics Students at Lanchester College of Technology, Coventry, 2nd January 1965

Aeronautics Students at Lanchester College of Technology, Coventry, 2nd January 1965

Background imageEngineering Collection: New water turbine house at Rugby College of Engineering Technology, 30th September 1964

New water turbine house at Rugby College of Engineering Technology, 30th September 1964. The water turbine was presented to the college by the English Electric Company

Background imageEngineering Collection: Assembly Hall of the Rugby College of Technology and Arts, 10th September 1959

Assembly Hall of the Rugby College of Technology and Arts, 10th September 1959

Background imageEngineering Collection: New Students Union building at Rugby College of Engineering Technology

New Students Union building at Rugby College of Engineering Technology, 15th November 1968

Background imageEngineering Collection: Student Accommodation Building at Rugby College of Engineering Technology

Student Accommodation Building at Rugby College of Engineering Technology, 27th January 1959

Background imageEngineering Collection: The engine is fitted to a Austin Mini on the production line, Longbridge. 10th March 1963

The engine is fitted to a Austin Mini on the production line, Longbridge. 10th March 1963

Background imageEngineering Collection: The transverse engine assembly line for the Mini The Austin Mini production line at

The transverse engine assembly line for the Mini The Austin Mini production line at Longbridge. 10th March 1963

Background imageEngineering Collection: Metal sheets are fed into the body panel press at the The Austin Mini production line

Metal sheets are fed into the body panel press at the The Austin Mini production line, Longbridge. 10th March 1963

Background imageEngineering Collection: Austin Mini body panels are assembled prior to welding and being placed on the production

Austin Mini body panels are assembled prior to welding and being placed on the production line at Longbridge. 10th March 1963

Background imageEngineering Collection: Body panels for the Austin Mini seen here being welded on the production line at

Body panels for the Austin Mini seen here being welded on the production line at Longbridge. 10th March 1963

Background imageEngineering Collection: The transverse engine assembly line for the Mini. The Austin Mini production line at

The transverse engine assembly line for the Mini. The Austin Mini production line at Longbridge. 10th March 1963

Background imageEngineering Collection: Body shells for the Austin Mini await to go through the production line at Longbridge

Body shells for the Austin Mini await to go through the production line at Longbridge. 10th March 1963

Background imageEngineering Collection: The front axel and engine seen here being mounted on to a Austin Mini on the production

The front axel and engine seen here being mounted on to a Austin Mini on the production line at Longbridge. 10th March 1963

Background imageEngineering Collection: Welding plates on an unnamed ship in the Swan Hunter shipyards on the Tyne

Welding plates on an unnamed ship in the Swan Hunter shipyards on the Tyne. 30th April 1973

Background imageEngineering Collection: The the luxury liner Vistafjord under construction at the Neptune Yard of Swan Hunter

The the luxury liner Vistafjord under construction at the Neptune Yard of Swan Hunter on the Tyne. 27th January 1972

Background imageEngineering Collection: The bows of the the luxury liner Vistafjord are eased into place at the Neptune Yard of

The bows of the the luxury liner Vistafjord are eased into place at the Neptune Yard of Swan Hunter on the Tyne. 27th January 1972

Background imageEngineering Collection: Apprentice at the British Rail Research Laboratories electrically testing a rail

Apprentice at the British Rail Research Laboratories electrically testing a rail fastening assembly. 18th May 1964

Background imageEngineering Collection: Mass production in the machine shop of small components for the mining industry

Mass production in the machine shop of small components for the mining industry. Pit prop cups being manufactured at Fairway Instruments, Nottingham. 31st August 1964

Background imageEngineering Collection: One of the plastic moulding shops in the Rennett Engineering and Plastic Works

One of the plastic moulding shops in the Rennett Engineering and Plastic Works, Wigman Road, Aspley, Nottingham. 20th February 1966

Background imageEngineering Collection: Mr David Ennals MP Under Secretary for the Army, seen here in the forge shop of

Mr David Ennals MP Under Secretary for the Army, seen here in the forge shop of Nottinghams Royal Ordnance during a tour of the factory. 10th August 1966

Background imageEngineering Collection: Windscreen being fitted to a Austin Mini van on the production line at Longbridge

Windscreen being fitted to a Austin Mini van on the production line at Longbridge. 10th March 1963

Background imageEngineering Collection: The engine bay on a Austin Mini is prepared to receive its engine on the production line

The engine bay on a Austin Mini is prepared to receive its engine on the production line at Longbridge. 10th March 1963

Background imageEngineering Collection: The Austin Motor pressing plant at the Longbridge Works. Circa 1929

The Austin Motor pressing plant at the Longbridge Works. Circa 1929

Background imageEngineering Collection: Chainmakers L Kirton of Netherton. 31st December 1947 A circlet of glowing metal in

Chainmakers L Kirton of Netherton. 31st December 1947 A circlet of glowing metal in his tongs: striker John Bladens hammer descends and a new link in the chain is created

Background imageEngineering Collection: BSA Bicycle assembly line in Small Heath 30th April 1935

BSA Bicycle assembly line in Small Heath 30th April 1935

Background imageEngineering Collection: Full scale model of the Britains UK-3 Satellite, Friday 5th August 1966

Full scale model of the Britains UK-3 Satellite, Friday 5th August 1966. The UK-3, United Kingdom Research Satellite 3, was renamed Ariel 3 before its launch in California (05/05/1967)

Background imageEngineering Collection: A college - school linkup that produced these industrial trolleys has got the push itself

A college - school linkup that produced these industrial trolleys has got the push itself. Cash cutbacks in education mean that the link course run for the past seven years between Ormesby

Background imageEngineering Collection: The Forth Rail Bridge, Scotland. Circa 1935

The Forth Rail Bridge, Scotland. Circa 1935

Background imageEngineering Collection: Prince Philip, Duke of Edinburgh, pictured taking a close look at the 'Sentinel'

Prince Philip, Duke of Edinburgh, pictured taking a close look at the "Sentinel"
Prince Philip, Duke of Edinburgh, pictured taking a close look at the " Sentinel" shunting locomotive made by Rolls-Royce. West Midlands. 1st May 1968

Background imageEngineering Collection: Poole Hospital Garden Fete, Nunthorpe, Middlesborough, Summer 1976

Poole Hospital Garden Fete, Nunthorpe, Middlesborough, Summer 1976. Our picture shows... children enjoying a ride on a model railway line

Background imageEngineering Collection: Workers on the production line at the Bianchi motorcycle factory in Milan producing

Workers on the production line at the Bianchi motorcycle factory in Milan producing handle bars. Circa 1955



All Professionally Made to Order for Quick Shipping